Bate Levina Meylan and Chua | R&D Tax Credit Audit Specialists

Industry · How the credit applies · Manufacturing and materials

R&D tax credit for energy and cleantech companies

How the research credit applies to energy storage, generation and efficiency companies: cells, systems, materials, processes and control software as business components, government-funded research and demonstration projects under the funding rules, the difference between a demonstration and an experiment, energy research consortia and the 100% contract rate, what examiners ask and the states where cleantech research clusters.

Last verifiedNovember 16, 2026
Key takeaway. Cleantech development qualifies through its experiments, and the field's funding structure is the main risk: federal awards and demonstration grants decide whose research it is, program by program, and a demonstration built to show a fixed design works is not an experiment.

Typical business components

The credit is tested per business component; these are the components this industry usually has, with the Form 6765 Section G type.

Component49(d) typeWhere the uncertainty usually is
Cell, module or packProductEnergy density, cycle life, safety and cost uncertain and tested
Power electronics or inverterProductEfficiency and reliability under grid conditions
Material or electrode chemistryFormulaProperties and manufacturability
Manufacturing process and scale-upProcessYield and consistency from pilot to plant
Control, monitoring or optimization softwareComputer software (All Others)Code C when in the product; internal-use rules for fleet tools
System integration methodProcessQualifies where the method was uncertain; standard installations do not

See business components and the Section G walkthrough.

What typically qualifies and what typically does not

Typically qualifies

  • Cell and material development with designed experiments against performance and life targets
  • Power electronics and control development where the method was uncertain and alternatives were tested
  • Process development and scale-up with recorded trials
  • Field tests designed as experiments with hypotheses, instrumentation and recorded results, where the company bore the risk and kept the rights
  • Failed chemistries and abandoned designs, when recorded

Typically does not

  • Production after design and process release
  • Demonstration projects built to show a fixed design works, especially when funded regardless of outcome with rights to the funder
  • Standard installations, permitting, interconnection and commissioning
  • Routine performance monitoring of deployed assets
  • Market, policy and economic studies
  • Research performed outside the United States

Every item still turns on the four-part test applied to the component; the guide how to apply the four-part test walks through it.

Common qualified research expense types

  • Wages of scientists and engineers and first-line supervisors by qualified share
  • Supplies: materials and components consumed in cells, prototypes and test articles
  • Contract research at 65%; 75% for a qualified research consortium; 100% for qualified energy research by eligible small businesses, universities and federal laboratories under §41(b)(3)(D)
  • Simulation and data compute

Definitions on qualified research expenses; the QRE estimator sums them.

Government and customer funding

Research funded by a grant, contract or another person is excluded to the extent payment is not contingent on success or the taxpayer does not retain substantial rights (Treas. Reg. §1.41-4A(d)). Federal awards, cost-plus and firm-fixed-price contracts each need the payment and rights clauses read, including data-rights provisions; cost-share agreements are funded only to the extent of the funding. The rule applies contract by contract and is the first thing an examiner asks about in a contracting business.

Funded research · Business components

Experiment or demonstration?

A demonstration project installs a design whose capability is already established to show stakeholders that it works at scale; an experiment is run because a technical question is open and is instrumented to answer it. Many funded cleantech projects are demonstrations by their own terms, and are excluded both as post-development work and, where the funder pays regardless and keeps rights, as funded research. Projects that genuinely test an uncertain design at scale can qualify if the hypotheses, instrumentation and results are recorded and the funding terms leave the company the risk and the rights.

Qualified research and the exclusions · Process of experimentation

Energy research consortia and the 100% rate

Contract research normally counts at 65%, or 75% when paid to a qualified research consortium. Amounts paid for qualified energy research to an eligible small business, an institution of higher education or a federal laboratory count at 100% under §41(b)(3)(D), and payments to an energy research consortium are a separate item on Form 6765 lines 1 and 14. The payee's status and the nature of the research must be documented for the higher rates.

Contract research · Form 6765 Section A

What examiners focus on

  • Award and demonstration agreements: payment contingency, cost share and rights, program by program
  • Whether field projects were instrumented experiments or demonstrations of fixed designs
  • Payee status and research type behind any 75% or 100% contract research rate
  • The boundary between development and production or deployment
  • Location of research teams and contract laboratories

See how an R&D exam runs and preparing for an R&D audit.

Case law

Only opinions Bate Levina Meylan and Chua has read in full for the federal pages; cited with their holdings.

Betz v. Commissioner, T.C. Memo. 2023-84 (U.S. Tax Court, July 6, 2023), Docket Nos. 21587-18, 21588-18

Holding: Costs of building functional pollution-control systems for customers failed §41(d)(1)(A) because the taxpayers did not prove the systems were pilot models, wage QREs were not tied to qualified services, and for five projects the company kept no substantial rights; penalties applied.

Why it matters here: Functional pollution-control systems built for customers were not research without uncertainty at the outset

Little Sandy Coal Co. v. Commissioner, No. 21-3145 (7th Cir. Mar. 7, 2023), affirming T.C. Memo. 2021-15

Holding: The credit was denied because the shipbuilder offered no principled way to show that at least 80 percent of its activities for each vessel were elements of a process of experimentation; generalized uncertainty, novelty and arbitrary time estimates were not enough.

Why it matters here: The substantially-all test must be shown by activity for each component

States that matter for this industry

Bate Levina Meylan and Chua's selection of states where this industry's research commonly sits, with each state's current credit status from the state record. Not a ranking; the state map covers all 51 jurisdictions.

Illustrative example

Nightjar Grid Storage · Long-duration iron-air storage systems, California · tax year 2025 · Illustrative

Illustrative facts. Nightjar Grid Storage in 2025: (1) an electrode formulation where cycle life at the target current density was uncertain, resolved through 300 recorded cell builds and cycling tests; (2) a thermal-management design for the module, developed through simulation and instrumented prototypes; (3) a federally funded demonstration of a fixed module design at a utility site, cost-shared, paid on milestones regardless of results, with government-purpose data rights and Nightjar retaining its intellectual property; (4) contract testing by a national laboratory of the cell chemistry under an agreement predating the work.

Electrode formulationQualifies

Technical uncertainty resolved by recorded cell builds and tests; cell materials are supplies

Thermal-management designQualifies

Design uncertainty, simulation and instrumented prototypes

Utility demonstrationFunded in part; demonstration

Fixed design shown at scale; funded to the extent of the award, with the company's cost share analyzed separately

National laboratory testingQualifies at 100%

Qualified energy research by a federal laboratory under §41(b)(3)(D), paid by Nightjar with rights retained

Outcome. The formulation and thermal design qualify, the laboratory testing counts at 100%, and the demonstration is analyzed as funded to the extent of the award and as post-development work in any case. California's credit applies to the same expenses.

FAQs

Is our government award excluded?

To the extent the agency pays regardless of outcome and holds substantial rights, yes; many awards leave the company its intellectual property with government-purpose rights in data, which requires a careful reading of the rights clauses. Cost-shared projects are funded only in proportion to the award. Analyze each award and keep the conclusion with the program file.

Can a demonstration project qualify?

A project that installs a fixed design to show it works is a demonstration, excluded as post-development work; a project at scale that tests an open technical question with hypotheses, instrumentation and recorded results can be an experiment. The project's own documents usually say which it is. Funding terms are analyzed separately.

When does contract research count at 100%?

When the payment is for qualified energy research performed by an eligible small business, an institution of higher education or a federal laboratory under §41(b)(3)(D), with the usual contract research conditions met. Payments to a qualified research consortium count at 75%; everything else at 65%. Document the payee's status and the research.

Are cell materials supplies?

Materials and components consumed in building and testing cells, prototypes and test articles are supplies used in qualified research; materials in production and in deployed systems are not, and test equipment is depreciable. Tie purchases to build and test records.

Which states matter?

The states where the research is actually performed, each applying its own credit to in-state research with its own base, rate and calendar; California, Texas, Massachusetts, Colorado, New York and Oregon are listed above with their current status from the state records, including Oregon's semiconductor-only credit. The multi-state guide and the multi-state estimator cover companies with laboratories, pilot lines and field teams in several states.

Sources

Last verified November 16, 2026 by Bate Levina Meylan and Chua Research.

Primary authority

Forms and instructions

Guidance and court opinions

Rules follow IRC §41 including §41(b)(3)(D), Treas. Reg. §1.41-4, §1.41-4A(d), §1.41-2 and §1.174-2 and the Form 6765 instructions as read for the federal pages; the two opinions were read in full for those pages. The example company is fictional.

Bate Levina Meylan and Chua audit defense

Awards and demonstrations to analyze?

Bate Levina Meylan and Chua reads the award terms and rights clauses, separates experiments from demonstrations and documents the contract research rates.