R&D tax credit for automotive suppliers and manufacturers

How the research credit applies in the automotive supply chain: components, systems, materials and processes as business components, customer-funded development and tooling under the funding rules, production-part approval as the boundary with production, process trials on the line, what examiners ask and the states where automotive research clusters, including Michigan's new credit.

Last verifiedNovember 16, 2026
Key takeaway. Automotive suppliers do real development under customer programs, and the credit turns on whether the customer's development payments and tooling arrangements left the supplier the risk and the rights, and on stopping the claim at production-part approval rather than carrying it into launch volume.

Typical business components

The credit is tested per business component; these are the components this industry usually has, with the Form 6765 Section G type.

Component49(d) typeWhere the uncertainty usually is
Component or subsystemProductPerformance, durability, weight or cost targets uncertain and tested
Material or process (forming, joining, coating)ProcessParameters and repeatability developed through trials
Electrified powertrain elementProductThermal, electrical and mechanical integration
Embedded controls softwareComputer software (All Others)Code C when embedded in the product
Tooling and fixture conceptProcessQualifies where the tooling design was uncertain and tested; purchased tooling is depreciable
Validation test methodTechniqueDeveloped where standard tests did not represent the condition

See business components and the Section G walkthrough.

What typically qualifies and what typically does not

Typically qualifies

  • Design and development iterations where meeting the specification was uncertain, tested on prototypes and test benches
  • Process development runs to find parameters that achieve quality or cycle-time targets, with recorded trials
  • Material and joining development tested for durability
  • Controls software development where the method was uncertain and alternatives were evaluated
  • Failed designs and scrapped prototype parts, when recorded

Typically does not

  • Production after production-part approval, including launch ramp-up
  • Routine quality control, inspection and production validation of approved parts
  • Building to the customer's drawings with established processes
  • Development paid by the customer regardless of outcome where the customer owns the design
  • Cost-reduction substitutions with known materials and methods
  • Research performed outside the United States

Every item still turns on the four-part test applied to the component; the guide how to apply the four-part test walks through it.

Common qualified research expense types

  • Wages of design, process, test and controls engineers and first-line supervisors by qualified share
  • Supplies: prototype materials and parts consumed in testing and process trials
  • Contract research and outside testing at 65% where the supplier bears the risk and keeps the rights
  • Simulation compute

Definitions on qualified research expenses; the QRE estimator sums them.

Production-part approval as the boundary

Development of a part under a customer program usually ends at production-part approval: the design and process are fixed and the customer has accepted them. Work after that point is production, excluded by §41(d)(4)(A), even during launch when the line is still being tuned. Development before approval qualifies where the design or process was uncertain and tested; record the approval date per part number and stop the claim there.

Qualified research and the exclusions · Supplies

Customer-funded development and tooling

Engineering, development and testing charges paid by the customer, and customer-owned tooling, raise the funded-research rules: to the extent payment is not contingent on success or the supplier does not retain substantial rights in the design, the research is funded and excluded. Amortising development cost into the piece price is different from a development payment due regardless; who owns the design and the right to reuse it decides. Read the nomination letter, terms and conditions and tooling agreements for each program.

Funded research · Business components

What examiners focus on

  • The production-part approval date per part and the classification of work before and after
  • Customer development payments, engineering change orders and tooling agreements: payment and rights
  • Whether process trials were experiments or routine launch adjustments
  • Hours by activity for the substantially-all test on each component
  • Wages of program managers, quality and launch staff

See how an R&D exam runs and preparing for an R&D audit.

Case law

Only opinions Bate Levina Meylan and Chua has read in full for the federal pages; cited with their holdings.

Siemer Milling Co. v. Commissioner, T.C. Memo. 2019-37 (U.S. Tax Court, Apr. 15, 2019), Docket No. 21655-15

Holding: Credits were denied because the flour miller offered no evidence that it formulated or tested hypotheses, modeled, simulated or evaluated alternatives, so it showed neither a process of experimentation nor that substantially all of its activities were part of one.

Why it matters here: Process improvements without evidence of hypotheses, tests and evaluation were denied

Little Sandy Coal Co. v. Commissioner, No. 21-3145 (7th Cir. Mar. 7, 2023), affirming T.C. Memo. 2021-15

Holding: The credit was denied because the shipbuilder offered no principled way to show that at least 80 percent of its activities for each vessel were elements of a process of experimentation; generalized uncertainty, novelty and arbitrary time estimates were not enough.

Why it matters here: The substantially-all test must be shown by activity for each component

Moore v. Commissioner, T.C. Memo. 2023-20 (U.S. Tax Court, Feb. 23, 2023), Docket No. 18632-19

Holding: A scoreboard manufacturer's chief operating officer did not perform direct supervision or direct support of qualified research, and the record did not show what portion of his product-development work was qualified research, so none of his wages counted.

Why it matters here: Wages must be tied to qualified services actually performed; higher-level supervision does not count

States that matter for this industry

Bate Levina Meylan and Chua's selection of states where this industry's research commonly sits, with each state's current credit status from the state record. Not a ranking; the state map covers all 51 jurisdictions.

Illustrative example

Lakefront Drivetrain Systems · Electric-axle gearsets, Michigan · tax year 2025 · Illustrative

Illustrative facts. Lakefront Drivetrain Systems in 2025: (1) a two-speed e-axle gearset with a noise target no existing tooth geometry met, developed through 22 prototype iterations and dynamometer tests; the customer's nomination pays a development charge contingent on meeting the noise specification and leaves Lakefront its design rights; (2) a hard-finishing process developed to hold the new geometry in production, with recorded parameter trials; (3) launch volume of 15,000 units after production-part approval in September; (4) a cost-down substitution of an equivalent bearing supplier.

Two-speed gearsetQualifies

Design uncertainty resolved by prototypes and dynamometer tests; payment contingent on performance and rights retained

Hard-finishing processQualifies

Separate process component; parameter experiments with recorded results

Launch volumeDoes not qualify

Production after production-part approval

Bearing substitutionDoes not qualify

Known alternative; no experimentation

Outcome. Two components qualify up to production-part approval, and Lakefront keeps them because its nomination terms made payment contingent on performance and left it the design. Michigan's new credit requires a tentative claim by March 15 after the year and was prorated for 2025; the Michigan page has the figures.

FAQs

The customer pays our development costs. Is the work ours?

It depends on the terms. A development charge payable regardless of whether the design meets the specification, with the design owned by the customer, makes the research funded and excluded; a charge contingent on performance, or terms that leave you substantial rights to reuse the design, keep it yours to that extent. Development cost recovered through the piece price is not a payment for the research as such. Read the nomination and the terms for each program.

When does development end on a customer program?

At production-part approval, when the design and the process are fixed and the customer has accepted them; launch volume, ramp-up and line tuning after that point are production and excluded, even when the plant is still adjusting. Record the approval date for each part number in the claim file and stop the claim there, as the example does, keeping the engineering change orders that show which work preceded it.

Do process trials on the production line qualify?

When they were experiments to find parameters that would achieve a quality or cycle-time target the plant did not know how to reach, with recorded trials and results, yes, as a process component. Routine launch adjustments and continuous-improvement tweaks with known methods do not, and Siemer Milling shows that results without recorded experiments are not enough.

Does customer-owned tooling matter?

Tooling owned by the customer is not your supply or your depreciable asset, and its design is usually the customer's; tooling concepts you developed under uncertainty and tested can qualify as process development if you keep the rights. Purchased tooling you own is depreciable property, outside the supply definition.

What is special about Michigan?

Michigan's credit, new for tax years from 2025, pays 3% of Michigan research expenses up to the base amount plus 15% or 10% above it by headcount, with caps, and requires a tentative claim filed through Michigan Treasury Online by March 15 after the calendar year (April 1, 2026 for 2025). Statewide claims for 2025 exceeded the cap and were prorated. The Michigan page and calculator have the rules and figures.

Sources

Last verified November 16, 2026 by Bate Levina Meylan and Chua Research.

Primary authority

Forms and instructions

Guidance and court opinions

Rules follow IRC §41, Treas. Reg. §1.41-4, §1.41-4A(d) and §1.41-2 and the Form 6765 instructions as read for the federal pages; the three opinions were read in full for those pages. The example company is fictional.

Bate Levina Meylan and Chua audit defense

Customer programs to analyze?

Bate Levina Meylan and Chua reads the nomination terms and tooling agreements, fixes the production-part approval boundary and documents the trials for each part number.