R&D tax credit for aerospace companies

How the research credit applies to aerospace and defense suppliers: airframe structures, propulsion components, avionics and manufacturing processes as business components, first articles versus production, government contracts and data rights under the funding rules, the Little Sandy Coal decision on the substantially-all test, what examiners ask and the states where aerospace research clusters.

Last verifiedNovember 16, 2026
Key takeaway. Aerospace work is often genuinely uncertain and heavily documented, so the credit turns on two questions: whether the government or prime contractor funded the research and kept the rights, and whether the substantially-all test can be shown by activity for each component rather than asserted for a program.

Typical business components

The credit is tested per business component; these are the components this industry usually has, with the Form 6765 Section G type.

Component49(d) typeWhere the uncertainty usually is
Structural component or assemblyProductLoad, weight, fatigue and manufacturability uncertain and tested
Propulsion or thermal componentProductPerformance under extreme conditions
Avionics, controls or embedded softwareComputer software (All Others)Code C when embedded in the product
Manufacturing process (composites, additive, machining)ProcessParameters and repeatability developed through trials
Test method or rigTechniqueDeveloped where standard methods did not apply
Qualification program elementProductQualifies only where testing resolved design uncertainty, not conformance

See business components and the Section G walkthrough.

What typically qualifies and what typically does not

Typically qualifies

  • Design and analysis iterations where the configuration meeting the requirement was uncertain, tested by coupon, element and sub-component tests
  • Process development for composites, additive manufacturing or special processes with recorded trials
  • Avionics and software development where the method was uncertain and alternatives were evaluated
  • First-article builds whose purpose was to resolve design or process uncertainty
  • Failed designs and scrapped test articles, when recorded

Typically does not

  • Production of qualified parts after design and process freeze
  • Conformance and acceptance testing of production articles
  • Work under contracts that pay regardless of outcome and give the government or prime unlimited rights, to the extent funded
  • Program management, bidding and proposal writing
  • Maintenance, repair and overhaul with established methods
  • Research performed outside the United States

Every item still turns on the four-part test applied to the component; the guide how to apply the four-part test walks through it.

Common qualified research expense types

  • Wages of design, stress, test and manufacturing engineers and first-line supervisors by qualified share
  • Supplies: materials consumed in test articles, coupons and process trials
  • Contract research and outside testing at 65% where the company bears the risk and keeps the rights
  • Simulation and analysis compute

Definitions on qualified research expenses; the QRE estimator sums them.

Government and customer funding

Research funded by a grant, contract or another person is excluded to the extent payment is not contingent on success or the taxpayer does not retain substantial rights (Treas. Reg. §1.41-4A(d)). Federal awards, cost-plus and firm-fixed-price contracts each need the payment and rights clauses read, including data-rights provisions; cost-share agreements are funded only to the extent of the funding. The rule applies contract by contract and is the first thing an examiner asks about in a contracting business.

Funded research · Business components

Little Sandy Coal and the substantially-all test

A shipbuilder claimed its vessels as business components and argued that the novel parts made the whole qualify; the Tax Court and the Seventh Circuit held that the substantially-all test asks whether 80% or more of the research activities, measured by cost or time, were elements of a process of experimentation, and the taxpayer offered no principled way to show it. Aerospace programs invite the same error: a program with real research inside it does not qualify as a whole. Define components, track hours by activity and shrink back to the subsets where experimentation dominated.

Process of experimentation and the 80% rule · Business components

What examiners focus on

  • Each contract's payment, cost-share and data-rights clauses and the funded-research conclusion by program
  • Component definition and hours by activity for the substantially-all test
  • First-article and qualification testing classified as development or conformance
  • Export-controlled and classified programs: how the records will be produced
  • Wages of program managers and quality staff

See how an R&D exam runs and preparing for an R&D audit.

Case law

Only opinions Bate Levina Meylan and Chua has read in full for the federal pages; cited with their holdings.

Little Sandy Coal Co. v. Commissioner, No. 21-3145 (7th Cir. Mar. 7, 2023), affirming T.C. Memo. 2021-15

Holding: The credit was denied because the shipbuilder offered no principled way to show that at least 80 percent of its activities for each vessel were elements of a process of experimentation; generalized uncertainty, novelty and arbitrary time estimates were not enough.

Why it matters here: A shipbuilder failed the substantially-all test for lack of a principled, activity-based showing that 80% of its activities were experimentation

Little Sandy Coal Co. v. Commissioner, T.C. Memo. 2021-15 (U.S. Tax Court, Feb. 11, 2021), Docket No. 17431-17, aff'd, No. 21-3145 (7th Cir. 2023)

Holding: The 80% substantially-all test is measured by research activities, not by the share of a product's physical components that are new, and people who directly supervise or support research are not engaged in it, so their activities cannot count as elements of a process of experimentation.

Why it matters here: The Tax Court's decision that the 80% test is measured by research activities, not by the share of novel physical components

Betz v. Commissioner, T.C. Memo. 2023-84 (U.S. Tax Court, July 6, 2023), Docket Nos. 21587-18, 21588-18

Holding: Costs of building functional pollution-control systems for customers failed §41(d)(1)(A) because the taxpayers did not prove the systems were pilot models, wage QREs were not tied to qualified services, and for five projects the company kept no substantial rights; penalties applied.

Why it matters here: Building functional systems for customers failed §41(d)(1)(A) without uncertainty at the outset

States that matter for this industry

Bate Levina Meylan and Chua's selection of states where this industry's research commonly sits, with each state's current credit status from the state record. Not a ranking; the state map covers all 51 jurisdictions.

Illustrative example

Skyward Composite Structures · Composite control surfaces for regional aircraft, Arizona · tax year 2025 · Illustrative

Illustrative facts. Skyward Composite Structures in 2025: (1) a thermoplastic elevator skin where fastener-free joining had no established process; the company developed the induction-welding parameters through 140 recorded coupon and element tests at its own cost and retained the process rights under its supply agreement; (2) production of 60 shipsets of a qualified rudder; (3) a government development contract for a heat-shield panel, cost-plus-fixed-fee with unlimited government data rights; (4) an in-house test rig developed because no commercial rig could apply the combined thermal and mechanical loads.

Thermoplastic elevator skin processQualifies

Process uncertainty resolved by recorded coupon and element tests; rights retained

Rudder productionDoes not qualify

Production after qualification

Heat-shield development contractFunded research

Paid regardless of outcome with unlimited government data rights

Combined-load test rigQualifies

Design uncertainty, built and validated to support the elevator program

Outcome. The welding process and its test rig qualify; the production run and the government-funded panel do not. Skyward tracks hours by activity on each component, which is what Little Sandy Coal required and its predecessor could not show. Arizona's credit applies to the same expenses.

FAQs

Our work is for the government or a prime. Is any of it ours?

Under the funded-research rules, research is excluded to the extent payment is not contingent on success or you do not retain substantial rights. Cost-plus and firm-fixed-price contracts usually pay regardless of outcome; data-rights clauses decide whether you keep substantial rights. Independent research and development funded by the company, and contract work where you keep rights and bear the cost of failure, can qualify. Analyze each contract and program.

Does a whole aircraft program qualify?

No. Little Sandy Coal rejected the argument that a vessel qualified as a whole because parts of it were novel; the test is whether 80% or more of the activities for the business component were experimentation, shown by cost or time. Define components at the level where that can be shown, track hours by activity and shrink back where the whole fails.

Is first-article and qualification testing research?

Testing run to resolve design or process uncertainty, where the results changed the design, is experimentation; testing run to demonstrate that a fixed design conforms to requirements is not. The same qualification campaign can contain both; classify by purpose and keep the test plans and the design changes they caused.

How do export controls affect documentation?

They affect how records are produced, not whether they are needed. Examiners can review controlled technical data under appropriate arrangements; plan with counsel how narratives and test records will be shared, and keep the credit file organized by component so the production can be scoped.

Which states matter?

The states where the engineering and testing are performed, each with its own credit on in-state research; Arizona, Texas, California, Connecticut, Kansas and Florida are listed above with their current status. The multi-state guide covers suppliers with sites in several states.

Sources

Last verified November 16, 2026 by Bate Levina Meylan and Chua Research.

Primary authority

Forms and instructions

Guidance and court opinions

Rules follow IRC §41, Treas. Reg. §1.41-4, §1.41-4A(d) and §1.41-2 and the Form 6765 instructions as read for the federal pages; the three opinions were read in full for those pages. The example company is fictional.