Bate Levina Meylan and Chua | R&D Tax Credit Audit Specialists

Federal research · The four-part test

Elimination of uncertainty

Qualified research begins with something the company did not know. The regulations define that uncertainty three ways, as uncertainty about capability, about method or about appropriate design, and require it to exist at the start of the work for this taxpayer. This page explains each kind, why 'it was complex' is not uncertainty, how uncertainty in one subsystem relates to the whole product, and what the Tax Court required in Phoenix Design Group.

Last verifiedNovember 9, 2026Rules effectiveAll open years

At a glance

Three kinds
Uncertainty about capability, about method, or about the appropriate design of the business component [1][2]
Taxpayer-specific
The taxpayer need not seek information beyond the common knowledge of skilled professionals in the field; what matters is what the taxpayer knew [1]
Timing
The uncertainty must exist at the beginning of the taxpayer's research activities [1]
Design uncertainty suffices
A process of experimentation can exist even with no uncertainty about capability or method, if the appropriate design is uncertain [1]
Subsystem versus whole
Uncertainty about one component does not by itself show uncertainty about other components or the whole product [2][4]
Success not required
The research need not succeed in developing the new or improved component [1]

The rule, explained

Every qualified research claim starts with a gap in knowledge. The regulations recognize three kinds. Capability uncertainty asks whether the thing can be done at all by this company: can the sensor detect the defect at line speed? Method uncertainty asks how to do it: which of several manufacturing routes will hit the tolerance? Design uncertainty asks what the right design is even when capability and method are known: which geometry, material or architecture best meets the requirements?

The uncertainty is measured against what the taxpayer knew, not against the world's knowledge. The regulation says the research need not exceed or refine the common knowledge of skilled professionals in the field. A company solving a problem its competitors have already solved privately can still have qualifying uncertainty. But the uncertainty must exist at the beginning of the work, and it has to be real: a problem that a competent engineer could resolve by looking up the answer or applying a standard method is not uncertainty.

This is where claims fail in court. In Phoenix Design Group, an engineering firm designing mechanical, electrical and plumbing systems for laboratory buildings argued that every project was uncertain because each building was unique. The Tax Court held that none of three projects qualified, at the whole-project level or under shrinking back, because the firm never identified the specific information that was unavailable to its engineers at the start, or explained how they reached their solutions. Uniqueness and complexity are not the same as uncertainty.

The court also repeated a point from the regulations that matters for scoping: uncertainty about one subsystem does not make the whole product uncertain. If only the control logic of a ventilation system was in doubt, that is the uncertainty to document, and the shrinking-back rule narrows the claim to it.

Statutory and regulatory detail

Treas. Reg. §1.41-4(a)(3)(i) provides that research is undertaken for the purpose of discovering information if it is intended to eliminate uncertainty concerning the development or improvement of a business component, and that uncertainty exists if the information available to the taxpayer does not establish the capability or method for developing or improving the business component, or the appropriate design of the business component [1]. §1.41-4(a)(3)(ii) adds that the taxpayer need not seek information that exceeds, expands or refines the common knowledge of skilled professionals in the field, and need not succeed [1]. Treas. Reg. §1.174-2(a)(1) uses the same capability, method and design formulation for research or experimental expenditures [2].

§1.41-4(a)(5)(i) requires the uncertainty to exist as of the beginning of the taxpayer's research activities, allows a process of experimentation where only the appropriate design is uncertain, and warns that uncertainty concerning the development or improvement of a business component does not establish that all activities undertaken to achieve it are a process of experimentation [1]. §1.174-2(a)(5) provides that uncertainty concerning certain components of a product does not necessarily indicate uncertainty concerning other components or the product as a whole [2].

In Phoenix Design Group, the Tax Court held that none of the three trial projects involved qualified research as a whole or at the shrinking-back level, rejecting general arguments about uncertainty because the taxpayer failed to identify the specific information unavailable to its engineers at the start of each project [4]. The court cited Betz for the proposition that uncertainty as to a subcomponent does not establish uncertainty as to the design of the whole product [4] [5].

Tax-year applicability

Which years each rule applies to, and the law that set it.

Tax yearsRuleAuthority
Expenditures in tax years ending on or after Dec. 31, 2003Uncertainty is defined by capability, method or appropriate design under the current §1.41-4 regulations.Treas. Reg. §1.41-4(a)(3), (a)(5), (e) [1]
All open yearsThe same uncertainty standard defines research or experimental expenditures for the §174 test, including the component-level rule.Treas. Reg. §1.174-2(a)(1), (a)(5) [2]

Worked example

Lakeshore Mechanical Engineers · MEP engineering consultancy, Michigan · illustrative figures, not a real taxpayer.

Lakeshore designed the mechanical systems for a university chemistry building in 2025 under a contract that let it reuse its methods. The firm learned from Phoenix Design Group and documented uncertainty at the subsystem level. The example shows how claimed hours are narrowed to the subsystems with recorded uncertainty. Figures are illustrative.

Lakeshore Mechanical Engineers: Elimination of uncertainty

  • Total engineering hours on the project: 6,000 at an average loaded wage rate of $95 per hour
  • Fume-hood exhaust control: the team did not know whether variable-air-volume control could hold containment during simultaneous sash openings at the lab's density; recorded in a design memo before modeling began. 1,400 hours
  • Heat recovery: uncertainty about whether a run-around loop could recover energy without cross-contaminating supply air; three loop configurations modeled. 900 hours
  • Standard ductwork sizing, equipment selection from catalogs, code checks and drawing production: 3,700 hours
  • Contract review shows payment not contingent on success but reuse rights retained, so funding limits apply separately
StepItemAmount
Exhaust controlCapability and design uncertainty identified in a dated memo; CFD models of four control schemes1,400 hrs
Heat recoveryDesign uncertainty identified; three configurations simulated against contamination limits900 hrs
Standard designEstablished methods and catalog selections; no uncertainty identified3,700 hrs
Shrink backProject as a whole: 2,300 ÷ 6,000 hours uncertain, so the whole building system fails; test the two subsystems38%
WagesHours on the two documented subsystems × $95$218,500
NextApply the funded-research partial-funding rule to the $218,500 under the contract termsSee funded research

Common preparer mistakes

  • Describing uncertainty as complexity, uniqueness or tight deadlines. The regulation requires missing information about capability, method or design.
  • Writing the uncertainty after the work is done. The regulation requires it to exist at the beginning, and examiners test that against document dates.
  • Claiming the whole product because one subsystem was uncertain. §1.174-2(a)(5) and Phoenix Design Group hold that subsystem uncertainty does not make the whole uncertain; shrink back instead.
  • Treating uncertainty as proof that all subsequent work was experimentation. §1.41-4(a)(5)(i) says it does not.
  • Overlooking design uncertainty. Many engineering firms have no capability or method doubt but genuine uncertainty about the appropriate design, which the regulation recognizes.

IDR and audit red flags

The document requests and questions examiners actually send on this topic, with what weak and strong support look like.

  1. IDR request: For each business component, state the specific information that was not available to the taxpayer at the beginning of the research activities and that the research was intended to discover, and identify whether it concerned capability, method or appropriate design.

    Weak support
    'The project was unique and required innovative solutions' or a generic description of the finished design.
    Strong support
    A dated pre-work memo or specification listing the open technical questions in measurable terms, tied to the component and to the people who worked on them.
  2. IDR request: Explain why the information sought could not have been obtained from existing sources, standards, vendor data, prior projects or the knowledge of the taxpayer's engineers before the work began.

    Weak support
    No discussion of available references, or reliance on the fact that no identical building or product existed.
    Strong support
    A description of the references consulted and why they did not resolve the question, with the gap identified.
  3. IDR request: Where uncertainty is asserted only as to a subsystem or component of a product, identify the subset of elements to which the claim relates and the QREs attributable to that subset.

    Weak support
    Whole-project hours claimed on the basis of uncertainty in one subsystem.
    Strong support
    A shrink-back analysis with hours and costs allocated to the uncertain subsystems from project time records.

Bate Levina Meylan and Chua's IDR guides: What an IRS IDR is · How to respond to R&D IDRs · Common R&D IDR requests

Where it shows up on Form 6765

Each section below links to its line-by-line walkthrough.

SectionLinesWhat this topic affects
Section G49(a)–(e), 50–56Each business component that passes all four parts is listed with its type and QREs by category; components that fail are left out entirely.
Section G49(f)Describes the information sought to be discovered; under the current instructions required on amended returns only, but the same statement belongs in the file for original returns [3].
Section F42–48QREs are totaled only for activities inside components that pass.

FAQs

If competitors already know how to do it, can we still have uncertainty?

Yes. Treas. Reg. §1.41-4(a)(3)(ii) says the research need not seek information that exceeds, expands or refines the common knowledge of skilled professionals in the field. The question is whether the information available to your company established the capability, method or appropriate design. A competitor's private solution is not available to you.

Is design uncertainty enough on its own?

Yes. The regulation provides that a process of experimentation can exist even if there is no uncertainty about capability or method, so long as the appropriate design of the result is uncertain at the beginning of the work. Engineering firms rely on this frequently, but they must still identify what about the design was unknown and how alternatives were evaluated.

Why did the engineering firm in Phoenix Design Group lose?

Because it argued uncertainty from the uniqueness and complexity of each building rather than identifying the specific information its engineers lacked at the start. The Tax Court found it could not tell, from the record, how the engineers reached their solutions, and held that none of the three trial projects involved qualified research as a whole or at the shrinking-back level.

When must the uncertainty be documented?

The regulation requires the uncertainty to exist at the beginning of the research activities, and examiners test that by looking for documents created at or before that point. Design memos, specification gap lists, risk registers and test plans dated before the experimentation are the strongest evidence. Narratives written for the claim can summarize them but cannot replace them.

Does resolving uncertainty mean every task on the project qualifies?

No. Treas. Reg. §1.41-4(a)(5)(i) states that uncertainty concerning the development or improvement of a business component does not establish that all activities undertaken to achieve it are a process of experimentation. The uncertainty opens the door; the 80% substantially-all test then measures how much of the work was actually spent evaluating alternatives.

Official sources

Primary authority only. Court opinions are cited only where we read the opinion.

Treasury regulations

  1. [1] Treasury regulation

    Treas. Reg. §1.41-4, Qualified research for expenditures paid or incurred in taxable years ending on or after December 31, 2003

    Electronic Code of Federal Regulations (eCFR)

    Accessed November 9, 2026

  2. [2] Treasury regulation

    Treas. Reg. §1.174-2, Definition of research and experimental expenditures

    Electronic Code of Federal Regulations (eCFR)

    Accessed November 9, 2026

IRS form or instructions

  1. [3] IRS form or instructions

    Instructions for Form 6765, Credit for Increasing Research Activities (Rev. December 2025)

    Internal Revenue Service

    Accessed November 9, 2026

Court opinions

  1. [4] Court opinion

    Phoenix Design Group, Inc. v. Commissioner, T.C. Memo. 2024-113

    United States Tax Court (opinion obtained from the court's DAWSON system)

    Phoenix Design Group, Inc. v. Commissioner, T.C. Memo. 2024-113 (U.S. Tax Court, Dec. 23, 2024), Docket No. 4759-22

    Held: None of three mechanical, electrical and plumbing engineering projects involved qualified research, as a whole or under the shrinking-back rule, because the firm never identified the specific information unavailable to its engineers at the outset or explained how they reached their solutions.

    Docket: dawson.ustaxcourt.gov/case-detail/4759-22

    Accessed November 9, 2026

  2. [5] Court opinion

    Betz v. Commissioner, T.C. Memo. 2023-84

    United States Tax Court (opinion obtained from the court's DAWSON system)

    Betz v. Commissioner, T.C. Memo. 2023-84 (U.S. Tax Court, July 6, 2023), Docket Nos. 21587-18, 21588-18

    Held: Costs of building functional pollution-control systems for customers failed §41(d)(1)(A) because the taxpayers did not prove the systems were pilot models, wage QREs were not tied to qualified services, and for five projects the company kept no substantial rights; penalties applied.

    Docket: dawson.ustaxcourt.gov/case-detail/21587-18

    Accessed November 9, 2026

Research methodology

Researched by
Bate Levina Meylan and Chua Research
Last verified
November 9, 2026
Primary sources checked
5

Every rule on this page was read in the Internal Revenue Code, Treas. Reg. §§1.41-4 and 1.174-2, the current Form 6765 and its instructions, and Public Law 119-21. The Tax Court opinions cited were read in full from the court's DAWSON system and the Seventh Circuit opinion from govinfo.gov. Anything we could not confirm is tagged for verification.

How we research · Report a correction

Bate Levina Meylan and Chua audit defense

Can you name what you didn't know?

Bate Levina Meylan and Chua helps teams record the specific unknowns at project start, so the uncertainty is in the file before the examiner asks for it.